Construction Photos |
 |
| TITLE |
+ |
- |
| FILE NAME |
+ |
- |
| DATE |
+ |
- |
| POSITION |
+ |
- |
|
|

Another Amenity for the Yard Crew24 viewsI put up a strip light to help with visibility in the yard... Not too bad.
|
|

Rebuilding Casselman Crossing1 views
|
|

Rebuilding Casselman Crossing0 viewsWhen we reconfigured the Connellsville sub, the bridge was more or less tossed back into place, leaving a nasty kink and some bad cuts in the rail. This shot also shows some of the bridge track ties having been pulled away from the rail.
|
|

Rebuilding Casselman Crossing1 viewsScabbed together during the reconstruction.
|
|

Yard Throat FPO16 views
|
|

Elkins Yard18 viewsBallasted and basic scenery added.
|
|

Elkins Yard12 viewsEngine House, the lump behind it will be the state highway with a concrete bridge over the yard throat.
|
|

Bottom of Elkins Yard13 viewsOverview looking east. ballast is still wet. Once dry I'll go back and clean up the ballast on the ties etc.
|
|

Fireballs!14 viewsBorrowed a decoder patient to snap a few pictures of the freshly painted Elkins Yard.
|
|

Bottom of Elkins Yard12 viewsCut some holes to run the wiring for the yard within the profile of the hollow core door.
|
|

Elkins Yard13 viewsTrack laid and painted. Went back and added some more black overspray to the areas that looked too red.
|
|

Interlocking linkage17 views
|
|

Location of helix and dispatch desk.14 views
|
|

Prepping Ridgeley Yard for New Track11 viewsI'm going to reconfigure the engine terminal, moving the engine house from the 9 o'clock postion shown here to about 6 o'clock. Might add a few more stalls, too.
|
|

Prepping Ridgeley Yard for New Track14 viewsIt's as if Chessie had been by for a visit...
|
|

Elkins Extension17 viewsPlywood plate serves to mount the Tortoise switch machine. This switch will be controlled by the Elkins yard master to direct traffic in and out of the yard.
|
|
|
|